|
Scheduling in the ERT Transportation Manager has been redesigned into a very flexible scheduling grid. Users may drag column headers to the top of the grid to modify the sorting and grouping. Favorite layouts may be saved and reloaded. The current image below shows the grid sorted by Status and Pickup date. A number of functions are available at the bottom of the grid
|